
The hospital building includes hidden elevators, hallways, pathways, and tunnels so the public does not see carts and patients in transport. The seven story hospital building has 500,000 square feet (46,000 m 2) of space. The surgical center is on 7 acres (2.8 ha) of land and is leased by Novi Orthopaedic Center Properties LLC. The medical office building is on 24 acres (9.7 ha) of land leased by the hospital. The campus includes a 500,000-square-foot (46,000 m 2) hospital building, a 210,000-square-foot (20,000 m 2) medical office building, and the 60,000-square-foot (5,600 m 2) Orthopedic and Ambulatory Surgical Center. The hospital campus is located near the intersection of Interstate 96 and Beck Road. Accordingly, the names of the hospitals, including the Novi one, changed to their current names. In 2018 the system was renamed Ascension Michigan as it had been acquired by Ascension Health. The system announced that the funds were to be used to expand Providence Park Hospital's neurosciences center and to buy capital equipment worth several million dollars. John Health System, made an unspecified donation to the health system the system stated it was the largest donation it ever received.

In 2009, Art Van Elslander, who had supported the St. John Providence project was over $300 million. As of August 2008, only one space in the building, with 2,400 square feet (220 m 2) of space, was not occupied. Providence Park Physicians LLC invested $39 million into the medical office building. Peter McCann, a doctor of Eye Care Associated, stated that originally the demand was go large that the plans were altered so the medical office building was larger. The medical office building was originally going to have 80,000 square feet (7,400 m 2) of space. The hospital building, with a cost of $229 million, was scheduled to be installed with 200 inpatient beds and it had capacity for an additional 68 beds. The hospital was scheduled to open with 400 employees, with a planned expansion to 1,200 with the final 100 being available by February 2009. Due to an installation of information technology systems for the electronic medical record system, the opening was moved to September 5. The hospital opening was scheduled for August 8, 2008. The architect was NBBJ's Columbus, Ohio office and the general contractor was Barton Malow of Southfield. A previous branch campus of the main Providence Hospital in Southfield, Michigan, with 300,000 square feet (28,000 m 2) of space was to be expanded to 700,000 square feet (65,000 m 2). The hospital was established due to population growth in western Oakland County. It was the first hospital in Southeast Michigan to open in 20 years. It is a Comprehensive Stroke Center and part of Ascension Michigan.


The Ascension Providence Hospital, Novi Campus, is a hospital in Novi, Michigan in Greater Detroit.
